New Rezoning Application at 1434-1465 West 8th Avenue

The site is situated in the Granville/Burrard Slopes – Area C, part of the Broadway Corridor. The project is adjacent the future South Granville subway station currently under construction at the corner of Broadway and Granville which creates a prime opportunity to add rental housing and retail space close to new and existing rapid transit networks. Under the Broadway Plan this area envisions a transit hub with multiple buildings up to 25 storeys. The proposed design will contribute to the aspirations of the Broadway Plan by strengthening the mixed-use character of the area, while contributing much needed rental stock and commercial amenity.

Developer: PCI
Units: 162 with 20% of the floor area 
offered at below-market rates
Storeys: 25
Height: 80.8m (254 ft)
Floorplates: lower tower 6,500 SF, and 5,500 SF above level 9
FSR: 8.07
Buildable Area: 133,703
Parking: 93 vehicle spaces, 281 bicycle spaces 

Full rezoning application on the link below:

1434-1456 W 8th Ave rezoning application | Shape Your City Vancouver